Company Profile
Zhejiang Huachuang Heavy Industry Co., Ltd. was established in 2020, with a professional design team, excellent department managers, and a comprehensive management system. It is a modern assembly and construction enterprise that integrates design, production, and installation. HC has the ability to provide customers for various steel building with reliable quality and good price.
Prefabricated Steel Construction Factory Light Weight Steel Structure for House Prefabricated Steel Workshop Warehouse Steel Structures Buildinging
Steel structure building is formed by the main framework through linking up the H beam, C purline, Z purline steel components. Roof and wall using a variety of panels together with other components such as windows and doors. The steel building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout, etc.
Production Process
Project Cases
Product Information
Size(m) |
Width * Length * Height; |
Type |
Single slope, double slope, Multi-slope; Single span, double-span, Multi-span; Single floor, double-floor, Multi-floor; |
Base |
steel foundation bolts |
Steel Frame |
Material Q345(S355JR)(Gr50)or Q235(S235JR) steel; Straight cross-section or Variable cross-section; steel welded H section painted or galvanized. |
Bracing |
X-type or V-type or other type bracing made from angle, round bar, etc ; |
Wall & Roof Purlin |
C section channel or Z section channel ,Size from C80~C300; Z100~Z300 |
Roof & Wall Cladding |
Single color corrugated steel sheet 0.326~0.7mm thickness; Sandwich panel with EPS, ROCK WOOL,GLASS WOOL, PU etc insulation, thickness around 50mm 75mm 100mm 120mm 150mm 200mm; recommend coating PVDF SMP HDP PE |
Window |
UPVC/PVC or Aluminum Alloy window frame with glass. |
Door |
Exterior door:Sliding or Roller shutter door. Internal door:50mm thickness EPS sandwich panel with an aluminum alloy door frame |
Gutter Material |
Color steel sheet or galvanized steel or stainless steel; |
Rainspout |
PVC pipe |
Connection |
high strength bolts ,intensive bolt,self-drilling screws. |
Accessories |
Skylight panel, Ventilation, Fasteners etc |
Surface Process |
Shot blasting Sa2.5;Two layers of Anti-rust Painting or galvanized |
Packing |
Main steel frame without packing load in 40' GP, roof and wall panel load in 40' HQ |
Certifications
FAQ
Pre-sale service
Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shanghai Pudong Intentional Airport, Hangzhou Xiaoshan International Airport or Wenzhou Longwan International Airport, then come to Lishui railway station through high speed train about 3 hours, 1 hour and 0.5 hour respectively, then we will pick you up at the railway station, hotel booking service is available.
Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost in advance in accordance with the payment term confirmed by both of us, then we will send the engineers and construction workers to supervise it.
Q3: What is a pre-engineered steel structure?
A: Pre-engineered steel structure means that the material is fabricated completely or partially in a factory, ready to be assembled on-site with bolts. There are many advantages to this building type and method. It is much faster than conventional building, as the fabrication takes place within a factory with the use of specialised equipment, and work is not dependant on the weather. On-site construction is also executed much faster, and it is less labour intensive.
Q4: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is at least 50 years-100 years. (standard request by GB standard)
Q5: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light FRP sheet is shorter, usually 8-15 years.
Q6: What is the anti-rust treatment for steel structure?
A: 12 head large shot blasting machine, shot blasting grade S2.5,
epoxy zinc rich primer,
epoxy cloud iron intermediate paint,
epoxy polyester topcoat.
Q7: Can we construct steel framed house on sea shores or mountains?
A: Steel systems are highly resistant to rust by galvanization process and can be lived safely mountainous areas or seaside areas with intense salt.
Q8: How do we cooperate on certain project?
A: Firstly, please send us your project details, your requirements and design proposal. Then we will make a quotation.Finally we make a deal.
Q9: Is your price competitive with other companies?
A: Our business objectives are to give the best price with same quality and best quality with the same price. We can try the best to cooperate with you to reduce your cost.
Q10: How to get the accurate quotation?
Checking Cost Of steel structure, Please Give Us The Information
(1) Dimension: Length, width, height, eave height, roof pitch, etc.
(2) Doors and windows: Dimension, quantity, position.
(3) Local climate: Wind speed, snow load, seismic magnitude etc.
(4) Insulation material: Panel type, sandwich materials, sandwich thickness
(5) crane metal structures: if have overhead crane, please tell the lifting height and lifting weight.
(6) Is there any materials that are not allowed to import to the country where the structure is planning to use?
(7) If you have other requirements, such as fire proofing, insulated roof, etc. Please also inform us.
(8) It's better if you have your own drawings or pictures. Please send them to us.
Online prices are for reference only. We will provide the latest market quotation based on actual drawings.
Q11: Is a steel structure better than concrete?
A: There are many advantages of steel structures over concrete structures, especially when it comes to structures for commercial, industrial and agricultural environments. In comparison, concrete is able to handle compressive stresses very effectively but it cannot handle high tensile stresses like steel. Concrete can be moulded into any shape, but requires steel reinforcement to increase its tensile strength, preventing cracks and deterioration of the structure. Concrete is also high in self-weight, with steel possessing an excellent strength to weight ratio. Steel structures are easier and faster to construct than concrete structures, and materials are easier to transport.
Q12: What are building regulations in China?
A: Buildings in China need to be designed according to General Specification for Steel Structures GB 55006-2021. You can rest assured that the team from HC will comply with all regulations regarding the design and construction of your commercial steel structure. We comply with the highest quality standards for assurance and will provide you and your company with a safe working environment and comprehensive knowledge in the field of structural steel.
Sale Service
Submission of support reaction data for foundation designing
Submission of construction drawing
Providing requirements for embedding
Construction manual
Fabrication & packing
Statistical table of material
Delivery
Other requirements by clients
After-Sale Service
Service of installation supervision
Instruction for using after installation completed
Warranty support
Maintenance support
Client satisfaction
Regularly visit for the project usage and provide advice
For Client Information
It would be better if you could supply us the following parameter before we design the drawings for you:
1.Location (where will be built)? |
_____country, area |
2.Size: length*width*height? |
_____m*_____m*_____m |
3.Wind load (or max. wind speed)? |
_____km/h |
4.Rain & snow load (or max. snow height)? |
_____kn/m2, _____mm |
5.Anti-earthquake _____level ? |
|
6.Usage of the building? |
|
7.Roof panel and wall panel? |
You could choose the sandwich panel, EPS, fibreglass wool, rock wool, PU sandwich. You could choose corrugated steel sheet and glass wool installed together on site either. |
8.Brick walls needed or not? |
If yes, 1.2m high or 1.5m high? |
9.Did Crane need or not? |
If yes, _____units, max. lifting weight____tons; max. lifting height _____m |